Grid connection · England, United Kingdom

Steelpoint BESS grid connection

Steelpoint BESS grid connection is a grid connection in England, United Kingdom, with 49.9 MW of capacity, held by Amber Energy Storage XL Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceSTEELPOINT BESS grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Skelmersdale)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderAmber Energy Storage XL LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toUnit 5 XL Business Park (matched by coordinates+technology+capacity+company, 0.77 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toSkelmersdale BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity49.9 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North WestSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date7 Jul 2016SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.5592, -2.7945SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Construction started: Unit 5 XL Business Park
  2. Permit granted: Unit 5 XL Business Park (planning authority West Lancashire, reference 2017/0968/FUL)
  3. Permit applied for: Unit 5 XL Business Park (planning authority West Lancashire, reference 2017/0968/FUL)

How it compares

Steelpoint BESS grid connection is the 597th-largest of 2,533 grid connections in England and the 904th-largest of 3,903 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England597th of 2,533319,370 MW<0.1%
United Kingdom904th of 3,903446,745 MW<0.1%
All grid connections in our data4,270th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 398 power plants (123 operating, 4,927 MW), 335 substations, 17 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
SkelmersdaleSubstation——0.3 km
Skelmersdale BSPSubstation——0.3 km
Unit 5 XL Business ParkPower plant49.9 MWUnder construction0.8 km
Willow HEYSubstation——1.2 km
Avondale Nurseries, Spa Lane - Battery Energy StoragePower plant320 MWPermitted2.1 km
Lathom (Pilkington Technical Centre)Power plant2.5 MWOperating2.2 km
Data center, England (OSM way 1551100328)Data center——14 km
Iron MountainData center——19 km
Verizon WarringtonData center——20 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom