Solar 2.5 MW grid connection at Norwood
Solar 2.5 MW grid connection at Norwood is a planned grid connection in England, United Kingdom, with 2.5 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Norwood) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Norwood (via a primary substation) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 2.5 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Solar | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Yorkshire) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Queue date | 19 Aug 2019 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 53.8799, -0.4473 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.
Request researchHow it compares
Solar 2.5 MW grid connection at Norwood is the 2,067th-largest of 2,533 grid connections in England and the 3,167th-largest of 3,903 in the United Kingdom by capacity; its 2.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,067th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 3,167th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 7,171st of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 315 power plants (78 operating, 3,635 MW), 133 substations, 1 transmission line and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Normandy Barracks | Power plant | 2.3 MW | Under construction | 0.8 km |
| Raventhorpe Nursery, Rootas Lane - Biomass Boiler | Power plant | 2 MW | Permitted | 2.0 km |
| Norwood | Substation | — | — | 3.6 km |
| Carr Lane, Tickton - Solar Farm | Power plant | 49.9 MW | Permitted | 4.9 km |
| Spark Mill Lane | Substation | — | — | 5.2 km |
| Beverley 132/33kV | Substation | — | — | 6.9 km |
| Continental Link Multi-Purpose Interconnector | Transmission line | — | Cancelled | 9.0 km |
| Aldbrough Hydrogen Storage | Gas storage facility | — | Planned | 25 km |
Grid operator and place
More from Northern Powergrid (Yorkshire) plc
- Battery storage and Solar and Wind 394.6 MW grid connection at Elm Tree Hybrid Direct395 MW
- Solar 320 MW grid connection at Creyke Beck Solar Direct320 MW
- Battery storage and Solar and Wind 299.7 MW grid connection at Little Becks Hybrid Direct300 MW
- Wind 240 MW grid connection at Calderdale Wind Farm Direct240 MW
- Battery storage 240 MW grid connection at NEL Conway2 BESS Direct240 MW
- Battery storage 240 MW grid connection at NEL Suggit BESS Direct240 MW
- Springfield Farm grid connection240 MW
- Springfield Farm grid connection240 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. The terms cover every document on caiso.com, the cluster reports included. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.