Grid connection · England, United Kingdom
Saint Gobain Glass UK Limited (Non-Exporting) grid connection
Saint Gobain Glass UK Limited (Non-Exporting) grid connection is a grid connection in England, United Kingdom, with 16 MW of capacity, held by Saint Gobain Glass UK Limited (Non-Exporting).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connection site: Saint Gobain Glass) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Operating (Connected) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Holder | Saint Gobain Glass UK Limited (Non-Exporting) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Ferrybridge A (via: bsp) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 16 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Gas | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Yorkshire) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Queue date | 1 Dec 2017 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 8 Jan 2024 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 66 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 53.7066, -1.1374 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Saint Gobain Glass UK Limited (Non-Exporting) grid connection is the 1,167th-largest of 2,533 grid connections in England and the 1,847th-largest of 3,903 in the United Kingdom by capacity; its 16 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,167th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 1,847th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,358th of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Connected
Nearby
Within 50 km of this grid connection: 464 power plants (121 operating, 4,414 MW), 378 substations and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Eggborough Biomass Power Station | Power plant | 10.6 MW | Cancelled | 0.5 km |
| Eggborough (Former Abre Biomass Facility) | Power plant | 10 MW | Cancelled | 0.6 km |
| Springfield Farm, Hensall - Battery Energy Storage Facility | Power plant | 240 MW | Permitted | 1.0 km |
| Eggborough | Substation | — | — | 1.0 km |
| Beal | Substation | — | — | 4.8 km |
| Pollington | Substation | — | — | 5.8 km |
| Yorkshire GREEN | Transmission line | — | Permitted | 23 km |
| North Humber to High Marnham | Transmission line | — | Planned | 33 km |
| Continental Link Multi-Purpose Interconnector | Transmission line | — | Cancelled | 49 km |
Holder, grid operator and place
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- CAISO queue report. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, No restriction on the posted data.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, No restriction on the posted data.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.