RARE CONTEXT Request research

Grid connection · England, United Kingdom

Plot 1 Kemsley Fields grid connection

Plot 1 Kemsley Fields grid connection is a grid connection in England, United Kingdom, with 2 MW of capacity, held by Wm Morrison plc.

Map: where Plot 1 Kemsley Fields grid connection lies
51.3714, 0.7455 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Grovehurst Local 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderWm Morrison plcUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toMorrisons roof mounted solar (matched by coordinates+technology+capacity, 0.24 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Attached toGrovehurst Local 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity2 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date11 May 2013UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3714, 0.7455UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Morrisons roof mounted solar
  2. Permit granted: Morrisons roof mounted solar (planning authority Swale, reference SW/13/0630)
  3. Permit applied for: Morrisons roof mounted solar (planning authority Swale, reference SW/13/0630)

How it compares

Plot 1 Kemsley Fields grid connection is the 2,993rd-largest of 3,539 grid connections in England and the 4,136th-largest of 4,870 in the United Kingdom by capacity; its 2 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,993rd of 3,539341,715 MW<0.1%
United Kingdom4,136th of 4,870467,981 MW<0.1%
All grid connections in our data7,868th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 337 power plants (131 operating, 7,013 MW), 229 substations, 10 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Morrisons roof mounted solarPower plant2 MWOperating0.2 km
Kemsley SubstationPower plant49.9 MWOperating0.5 km
Garden of England EnergyPower plant10.4 MWCancelled0.5 km
Grovehurst Local 11kVSubstation——0.8 km
Sittingbourne Town 11kVSubstation——3.4 km
Sittingbourne West 11kVSubstation——4.0 km
Sota DatacentreData center——6.5 km
CustodianDC MaidstoneData center——17 km
CXD Infrastructure SolutionsData center——17 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page