Grid connection · England, United Kingdom
Pattenden Lane Solar Farm grid connection
Pattenden Lane Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 11.3 MW of capacity, connected by South Eastern Power Networks plc (UK Power Networks, South East England licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Pembury Grid 33kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Pattenden Lane - Solar PV Energy (matched by name+coordinates+technology, 0.82 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 11.3 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 19 Jan 2023 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 31 Oct 2037 (target energisation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.1753, 0.4860 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Permit applied for: Pattenden Lane - Solar PV Energy (planning authority Maidstone, reference 24/505235/FULL)
How it compares
Pattenden Lane Solar Farm grid connection is the 1,772nd-largest of 3,539 grid connections in England and the 2,506th-largest of 4,870 in the United Kingdom by capacity; its 11.3 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,772nd of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 2,506th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 6,094th of 8,618 | 1,355,288 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 307 power plants (126 operating, 6,742 MW), 274 substations and 30 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Marden 11kV | Substation | — | — | 0.3 km |
| Pattenden Lane - Solar PV Energy | Power plant | 19 MW | Planned | 0.8 km |
| Eckley Farms, Marden - Solar Energy Farm | Power plant | 49.9 MW | Permitted | 1.2 km |
| Great Pagehurst Farm | Power plant | 13.6 MW | Cancelled | 2.5 km |
| Staplehurst 6.6kV | Substation | — | — | 4.2 km |
| Paddock Wood 11kV | Substation | — | — | 6.5 km |
| CXD Infrastructure Solutions | Data center | — | — | 12 km |
| CustodianDC Maidstone | Data center | — | — | 12 km |
| Sota Datacentre | Data center | — | — | 23 km |
Grid operator and place
More from South Eastern Power Networks plc
- Shoreham Power Station grid connection460 MW
- Thanet Windfarm grid connection315 MW
- Southfleet Hook Green grid connection300 MW
- Land At Hookers Farm grid connection263 MW
- Eastlands Farm grid connection240 MW
- Bank Farm Solar grid connection99.9 MW
- Barge Way grid connection99.9 MW
- Coombe Farm grid connection99.9 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.