Grid connection · England, United Kingdom

Palmersford PV grid connection

Palmersford PV grid connection is a grid connection in England, United Kingdom, with 3.33 MW of capacity, held by Blackfinch Investments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourcePALMERSFORD PV grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Palmersford PV GEN)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderBlackfinch Investments LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toRedhill BSP (via a bulk supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity3.33 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date19 Dec 2015SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.7905, -1.8592SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Palmersford PV grid connection is the 1,961st-largest of 2,533 grid connections in England and the 3,012th-largest of 3,903 in the United Kingdom by capacity; its 3.33 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,961st of 2,533319,370 MW<0.1%
United Kingdom3,012th of 3,903446,745 MW<0.1%
All grid connections in our data6,694th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 256 power plants (116 operating, 981 MW), 156 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chapel Lane Parley Solar Farm Phase 1Power plant20 MWOperating0.2 km
Parley Renewable Energy Park (PV)Power plant5 MWCancelled0.5 km
Parley Renewable Energy Park (AD)Power plant1 MWCancelled0.6 km
Redhill BSPSubstation——3.2 km
Redhill PrimarySubstation——3.2 km
Ferndown PrimarySubstation——3.8 km
Data Vault - Bournemouth BCP01Data center——7.7 km
Sky ChilworthData center——36 km
SCCData center——44 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom