Grid connection · England, United Kingdom
Northfleet East Grid grid connection
Northfleet East Grid grid connection is a planned grid connection in England, United Kingdom, with 35 MW of capacity, held by Aton Energy Development Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Northfleet East 33kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Aton Energy Development Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | New Barn Road - Battery Energy Storage Facility (matched by coordinates+technology+capacity+company, 1.34 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 35 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Battery storage | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 6 Jan 2017 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 30 Jun 2025 (target energisation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.4277, 0.3311 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Permit granted: New Barn Road - Battery Energy Storage Facility (planning authority Dartford, reference 23/00863/FUL)
- Permit applied for: New Barn Road - Battery Energy Storage Facility (planning authority Dartford, reference 23/00863/FUL)
How it compares
Northfleet East Grid grid connection is the 1,015th-largest of 3,539 grid connections in England and the 1,445th-largest of 4,870 in the United Kingdom by capacity; its 35 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,015th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 1,445th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 4,735th of 8,618 | 1,355,288 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Was due to connect; the register does not list it as connected
Nearby
Within 50 km of this grid connection: 485 substations, 340 power plants (131 operating, 8,058 MW), 79 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Northfleet East 33kV | Substation | — | — | 0.0 km |
| Foxhounds Lane, Southfleet - Battery Storage | Power plant | 300 MW | Cancelled | 0.7 km |
| Thames Way, Northfleet - Battery Energy Storage | Power plant | 100 MW | Planned | 1.1 km |
| Ebbsfleet 11KV | Substation | — | — | 1.3 km |
| New Barn Road - Battery Energy Storage Facility | Power plant | 35 MW | Permitted | 1.3 km |
| Gravesend South 11kV | Substation | — | — | 2.2 km |
| CustodianDC DA2 | Data center | — | — | 5.8 km |
| Fujitsu Data Centre | Data center | — | — | 7.3 km |
| OVH data center, England | Data center | — | — | 13 km |
Holder, grid operator and place
More from Aton Energy Development Limited
- New Barn Road - Battery Energy Storage Facility35 MW · permitted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.