Malmaynes Hall Solar Park grid connection

Malmaynes Hall Solar Park grid connection is a grid connection in England, United Kingdom, with 12 MW of capacity, held by Wessex Solar Energy Developments Limited.

Map: where Malmaynes Hall Solar Park grid connection lies
51.4456, 0.6198 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Northfleet East 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderWessex Solar Energy Developments LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toMalmaynes Hall Farm (matched by name+coordinates+technology+capacity+company, 1.1 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity12 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date30 Mar 2015UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.4456, 0.6198UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Malmaynes Hall Farm
  2. Permit granted: Malmaynes Hall Farm (planning authority Medway, reference MC/14/2082)
  3. Permit applied for: Malmaynes Hall Farm (planning authority Medway, reference MC/14/2082)

How it compares

Malmaynes Hall Solar Park grid connection is the 1,720th-largest of 3,539 grid connections in England and the 2,440th-largest of 4,870 in the United Kingdom by capacity; its 12 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,720th of 3,539341,715 MW<0.1%
United Kingdom2,440th of 4,870467,981 MW<0.1%
All grid connections in our data6,026th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 345 power plants (138 operating, 7,184 MW), 283 substations, 43 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Malmaynes Hall FarmPower plant12 MWOperating1.1 km
London Medway Commercial ParkPower plant1.3 MWCancelled1.2 km
Shakespeare Farm Landfill SitePower plant1 MWOperating2.1 km
Kingsnorth Grid 11kVSubstation——3.1 km
Grain 11kVSubstation——4.9 km
Sheerness 6.6kVSubstation——9.0 km
CityFibre CabinetsData center——14 km
Sota DatacentreData center——16 km
Imperium 315Data center——18 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom