Grid connection · England, United Kingdom

Lower End PV grid connection

Lower End PV grid connection is a grid connection in England, United Kingdom, with 4.28 MW of capacity, held by Good Energy Generation Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLOWER END PV grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connection site: LOWER END PV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (CONNECTED)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderGood Energy Generation LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toNorrington BSP (via: bsp)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity4.28 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date28 May 2015SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.3059, -2.0420SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Lower End PV grid connection is the 1,876th-largest of 2,678 grid connections in England and the 3,175th-largest of 4,493 in the United Kingdom by capacity; its 4.28 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,876th of 2,678322,469 MW<0.1%
United Kingdom3,175th of 4,493459,551 MW<0.1%

Nearby

Within 50 km of this grid connection: 115 substations, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Easterton PrimarySubstation——4.7 km
Devizes PrimarySubstation——5.5 km
Bromham PrimarySubstation——9.8 km

Holder, grid operator and place

More from Good Energy Generation Ltd

Other grid connections in England

All 3977 grid connections in England, United Kingdom

Data on this page