Grid connection · England, United Kingdom

Little Hulton Solar Farm grid connection

Little Hulton Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 2 MW of capacity, held by Salford City Council.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLITTLE HULTON SOLAR FARM grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Little Hulton)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderSalford City CouncilSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toKenyon Way (matched by coordinates+technology+capacity, 0.04 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toLittle Hulton (via a primary substation)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity2 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.5279, -2.4352SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Kenyon Way (planning authority Salford, reference 20/74960/FUL)
  2. Permit applied for: Kenyon Way (planning authority Salford, reference 20/74960/FUL)

How it compares

Little Hulton Solar Farm grid connection is the 2,165th-largest of 2,533 grid connections in England and the 3,341st-largest of 3,903 in the United Kingdom by capacity; its 2 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,165th of 2,533319,370 MW<0.1%
United Kingdom3,341st of 3,903446,745 MW<0.1%
All grid connections in our data7,347th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 412 power plants (122 operating, 1,328 MW), 390 substations, 20 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kenyon WayPower plant1.9 MWUnder construction0.0 km
Cleworth Hall FarmPower plant5 MWCancelled0.7 km
Little HultonSubstation——1.0 km
CutacreSubstation——1.6 km
Salford Road Solar FarmPower plant2.2 MWOperating1.8 km
Hill Top T11 & T12Substation——2.4 km
Evolution @ Agecroft Commerce ParkData center——8.9 km
Data center, England (OSM way 1535147042)Data center——9.7 km
Joule HouseData center——11 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page