Grid connection · England, United Kingdom

Lane End Energy Centre grid connection

Lane End Energy Centre grid connection is a planned grid connection in England, United Kingdom, with 4.6 MW of capacity, held by P3P Partners LLP.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLANE END ENERGY CENTRE grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Arreton Nurseries)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderP3P Partners LLPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toFawley GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity4.6 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyADVANCED FUEL GASIFICATION OR PYROLYSISSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date30 Jan 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Apr 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.6580, -1.2273SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Lane End Energy Centre grid connection is the 1,753rd-largest of 2,533 grid connections in England and the 2,715th-largest of 3,903 in the United Kingdom by capacity; its 4.6 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,753rd of 2,533319,370 MW<0.1%
United Kingdom2,715th of 3,903446,745 MW<0.1%
All grid connections in our data6,692nd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 172 power plants (76 operating, 602 MW), 128 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Arreton Valley Nursery, Hale Common - Battery StoragePower plant1.26 MWPermitted0.2 km
FieldscalePower plant10.6 MWOperating2.4 km
Gore Cross - ADPower plant2.2 MWOperating2.5 km
Shanklin PrimarySubstation——4.1 km
Sandown PrimarySubstation——5.2 km
Wootton Common BSPSubstation——6.1 km
ServerHouseData center——22 km
ServerhouseData center——23 km
AstrohouseData center——23 km

Holder, grid operator and place

More from P3P Partners LLP

Other grid connections in England

All 3831 grid connections in England, United Kingdom