Grid connection · England, United Kingdom
Lane End Energy Centre grid connection
Lane End Energy Centre grid connection is a planned grid connection in England, United Kingdom, with 4.6 MW of capacity, held by P3P Partners LLP.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | LANE END ENERGY CENTRE grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Arreton Nurseries) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | P3P Partners LLP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Fawley GSP (via a grid supply point) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 4.6 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | ADVANCED FUEL GASIFICATION OR PYROLYSIS | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 30 Jan 2023 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 30 Apr 2026 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.6580, -1.2273 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Lane End Energy Centre grid connection is the 1,753rd-largest of 2,533 grid connections in England and the 2,715th-largest of 3,903 in the United Kingdom by capacity; its 4.6 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,753rd of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 2,715th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 6,692nd of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Was due to connect; the register does not list it as connected
Nearby
Within 50 km of this grid connection: 172 power plants (76 operating, 602 MW), 128 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Arreton Valley Nursery, Hale Common - Battery Storage | Power plant | 1.26 MW | Permitted | 0.2 km |
| Fieldscale | Power plant | 10.6 MW | Operating | 2.4 km |
| Gore Cross - AD | Power plant | 2.2 MW | Operating | 2.5 km |
| Shanklin Primary | Substation | — | — | 4.1 km |
| Sandown Primary | Substation | — | — | 5.2 km |
| Wootton Common BSP | Substation | — | — | 6.1 km |
| ServerHouse | Data center | — | — | 22 km |
| Serverhouse | Data center | — | — | 23 km |
| Astrohouse | Data center | — | — | 23 km |
Holder, grid operator and place
More from P3P Partners LLP
- Union Street Gas Peaker grid connection7 MW
- Cholmondeley Road - Battery Storage150 MW · permitted
- Widow Hill, Balderstone Lane - Battery Energy Storage System70 MW · under construction
- Barnwell, Wright Street - Battery Energy Storage49.9 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. The terms cover every document on caiso.com, the cluster reports included. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.