Power plant · Isle of Wight, England, United Kingdom

Arreton Valley Nursery, Hale Common - Battery Storage

Arreton Valley Nursery, Hale Common - Battery Storage is a cancelled battery storage plant in Isle of Wight, England, United Kingdom, with 1.26 MW of capacity, operated by Iow Squirrel Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationIsle of Wight (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressArreton Valley Nursery, Hale Common, Newport, PO30 3ARDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date31 Jul 2023 (permit 23/00900/FUL, Town and Country Planning Act, issued by Isle of Wight)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 May 2023 (reference 23/00900/FUL, planning authority Isle of Wight)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date31 Jul 2023 (granted, reference 23/00900/FUL, planning authority Isle of Wight)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorIow Squirrel Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.26 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.6582, -1.2244DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Isle of Wight, reference 23/00900/FUL)
  2. Permit applied for (planning authority Isle of Wight, reference 23/00900/FUL)

How it compares

Arreton Valley Nursery, Hale Common - Battery Storage is the 3,767th-largest of 4,035 power plants in England and the 5,483rd-largest of 5,834 in the United Kingdom by capacity; its 1.26 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,767th of 4,035134,434 MW<0.1%
United Kingdom5,483rd of 5,834200,500 MW<0.1%
All power plants in our data15,196th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 159 grid connections (92 operating, 797 MW), 128 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Arreton Valley Nursery grid connectionGrid connection2.52 MWPlanned0.2 km
Arreton Valley Nursery grid connectionGrid connection33.3 MWOperating0.2 km
Lane End Energy Centre grid connectionGrid connection4.6 MWPlanned0.2 km
Shanklin PrimarySubstation——3.9 km
Sandown PrimarySubstation——5.0 km
Wootton Common BSPSubstation——6.1 km
ServerHouseData center——22 km
ServerhouseData center——23 km
AstrohouseData center——23 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page