RARE CONTEXT Request research

Grid connection · England, United Kingdom

Horton Wood Solar Farm grid connection

Horton Wood Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 49.9 MW of capacity, held by NextPower Horton Wood Limited.

Map: where Horton Wood Solar Farm grid connection lies
51.3819, 0.2645 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Northfleet East)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderNextPower Horton Wood LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toHorton Wood - Solar park (matched by name+coordinates+technology+capacity+company, 2.22 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity49.9 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date29 Sept 2020UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2025 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3819, 0.2645UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: Horton Wood - Solar park (planning authority Sevenoaks, reference 22/02599/FUL)
  2. Permit applied for: Horton Wood - Solar park (planning authority Sevenoaks, reference 22/02599/FUL)

How it compares

Horton Wood Solar Farm grid connection is the 698th-largest of 3,539 grid connections in England and the 997th-largest of 4,870 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England698th of 3,539341,715 MW<0.1%
United Kingdom997th of 4,870467,981 MW<0.1%
All grid connections in our data4,183rd of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 500 substations, 335 power plants (131 operating, 8,005 MW), 88 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chimmens Solar FarmPower plant49.9 MWCancelled1.4 km
Farningham 11kVSubstation——2.1 km
Horton Wood - Solar parkPower plant49.9 MWCancelled2.2 km
Longfield 11kVSubstation——3.3 km
West KingdownPower plant20 MWCancelled3.5 km
Stonemarshes 11kVSubstation——6.8 km
CustodianDC DA2Data center——8.0 km
Fujitsu Data CentreData center——11 km
OVH data center, EnglandData center——14 km

Holder, grid operator and place

More from NextPower Horton Wood Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page