Grid connection · England, United Kingdom

Higher Moss BESS grid connection

Higher Moss BESS grid connection is a planned grid connection in England, United Kingdom, with 85 MW of capacity, held by Peel Cubico Renewables Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceHIGHER MOSS BESS grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Scout Moor)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderPeel Cubico Renewables LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity85 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date21 Jun 2024SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.6496, -2.2707SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Higher Moss BESS grid connection is the 402nd-largest of 2,533 grid connections in England and the 529th-largest of 3,903 in the United Kingdom by capacity; its 85 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England402nd of 2,533319,370 MW<0.1%
United Kingdom529th of 3,903446,745 MW<0.1%
All grid connections in our data3,202nd of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 372 power plants (106 operating, 853 MW), 144 substations, 2 CO2 emitters and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fletcher Bank Quarry (Waste AD)Power plant2 MWCancelled1.8 km
Scout Moor WindfarmPower plant65 MWOperating2.3 km
Scout Moor Windfarm (extension)Power plant36.8 MWCancelled2.3 km
TodmordenSubstation——13 km
Hebden BridgeSubstation——19 km
MytholmroydSubstation——20 km
East Irish Sea Transmission ProjectTransmission line—Planned40 km
Keuper Underground Gas Storage Facility Material Change 1CO2 emitter—Planned48 km
Keuper Gas Storage ProjectCO2 emitter—Permitted49 km

Holder, grid operator and place

More from Peel Cubico Renewables Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page