Grid connection · England, United Kingdom
High Bridge Farm Hybrid Add Wind and BESS grid connection
High Bridge Farm Hybrid Add Wind and BESS grid connection is a planned grid connection in England, United Kingdom, with 10 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at High Bridge Farm Hybrid Direct) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Saltend 132/33kV (via a bulk supply point) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 10 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Wind | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Battery storage | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Yorkshire) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Queue date | 11 Mar 2025 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 53.7136, -0.1339 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its grid operator? Ask us.
How it compares
High Bridge Farm Hybrid Add Wind and BESS grid connection is the 1,332nd-largest of 2,533 grid connections in England and the 2,105th-largest of 3,903 in the United Kingdom by capacity; its 10 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,332nd of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 2,105th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,678th of 7,616 | 1,281,251 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 252 power plants (62 operating, 881 MW), 103 substations, 1 CO2 emitter and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Ottringham Road, Keyingham - Anaerobic Digestion Facility | Power plant | 7 MW | Permitted | 2.3 km |
| Ottringham Road | Substation | — | — | 2.3 km |
| Ellifoot Lane | Substation | — | — | 2.8 km |
| Far Marsh Farm | Power plant | 7.5 MW | Operating | 4.2 km |
| Burton Pidsea (Wadworth Hill) Wind Farm | Power plant | 10.2 MW | Operating | 4.3 km |
| Patrington Road | Substation | — | — | 4.6 km |
| Aldbrough Hydrogen Storage | CO2 emitter | — | Planned | 11 km |
| Continental Link Multi-Purpose Interconnector | Transmission line | — | Cancelled | 21 km |
Grid operator and place
More from Northern Powergrid (Yorkshire) plc
- Battery storage and Solar and Wind 394.6 MW grid connection at Elm Tree Hybrid Direct395 MW
- Solar 320 MW grid connection at Creyke Beck Solar Direct320 MW
- Battery storage and Solar and Wind 299.7 MW grid connection at Little Becks Hybrid Direct300 MW
- Wind 240 MW grid connection at Calderdale Wind Farm Direct240 MW
- Battery storage 240 MW grid connection at NEL Conway2 BESS Direct240 MW
- Battery storage 240 MW grid connection at NEL Suggit BESS Direct240 MW
- Springfield Farm grid connection240 MW
- Springfield Farm grid connection240 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.