Hazel Grove PV Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 30 MW of capacity, held by Conrad Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceHAZEL GROVE PV SOLAR FARM grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Hazel Grove)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderConrad Energy LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toTorkington Road, Hazel Grove - Solar PV Panels (matched by shared name+coordinates+technology+capacity+company, 0.76 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toHazel Grove BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity30 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date24 Feb 2023SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.3870, -2.0833SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit applied for: Torkington Road, Hazel Grove - Solar PV Panels (planning authority Stockport, reference DC/096042)

How it compares

Hazel Grove PV Solar Farm grid connection is the 857th-largest of 2,533 grid connections in England and the 1,333rd-largest of 3,903 in the United Kingdom by capacity; its 30 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England857th of 2,533319,370 MW<0.1%
United Kingdom1,333rd of 3,903446,745 MW<0.1%
All grid connections in our data4,846th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 440 substations, 384 power plants (111 operating, 1,108 MW), 22 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Torkington Road, Hazel Grove - Solar PV PanelsPower plant30 MWPlanned0.8 km
MarpleSubstation——1.6 km
Hawk GreenSubstation——1.6 km
Green Lane (Hazel Grove)Substation——2.8 km
Newby Road, Hazel Grove - Battery StoragePower plant7.5 MWPermitted3.0 km
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy StoragePower plant40 MWPermitted3.2 km
CDL Strata Campus Data CentreData center——6.8 km
Data center, England (OSM way 703959498)Data center——11 km
Delta HouseData center——12 km