RARE CONTEXT Request research

Grid connection · England, United Kingdom

Hatfield Avenue grid connection

Hatfield Avenue grid connection is a planned grid connection in England, United Kingdom, with 1.68 MW of capacity, held by Low Carbon Energy Limited.

Map: where Hatfield Avenue grid connection lies
51.7741, -0.2454 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Tunnel Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderLow Carbon Energy LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toComputacenter Warehouse (matched by coordinates+technology+capacity, 0.2 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Attached toTunnel Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity1.68 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date29 Oct 2019UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Dec 2024 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.7741, -0.2454UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Construction started: Computacenter Warehouse
  2. Permit granted: Computacenter Warehouse (planning authority Welwyn Hatfield, reference 6/2019/0141/MAJ)
  3. Permit applied for: Computacenter Warehouse (planning authority Welwyn Hatfield, reference 6/2019/0141/MAJ)

How it compares

Hatfield Avenue grid connection is the 3,148th-largest of 3,539 grid connections in England and the 4,360th-largest of 4,870 in the United Kingdom by capacity; its 1.68 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England3,148th of 3,539341,715 MW<0.1%
United Kingdom4,360th of 4,870467,981 MW<0.1%
All grid connections in our data8,096th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 527 substations, 429 power plants (163 operating, 4,023 MW), 135 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Computacenter WarehousePower plant2 MWUnder construction0.2 km
Gypsy Moth Avenue - Solar ArrayPower plant1.2 MWCancelled0.4 km
Tunnel Primary 11kVSubstation——1.1 km
Stanborough, Hatfield - Battery Energy Storage SystemPower plant1.5 MWPermitted2.1 km
Chantry Ln Primary 11kVSubstation——2.5 km
Central Welwyn Primary 11kVSubstation——3.0 km
Colt London North Data CentreData center——5.1 km
BT Computer CentreData center——5.2 km
Hertfordshire Data CentreData center——5.5 km

Holder, grid operator and place