Hadlow Solar Park Lilley Farm grid connection is a grid connection in England, United Kingdom, with 16.5 MW of capacity, held by British Solar Limited.

Map: where Hadlow Solar Park Lilley Farm grid connection lies
51.1876, 0.3293 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Pembury Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderBritish Solar LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toHadlow Place solar farm (matched by shared name+coordinates+technology+capacity, 1.04 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity16.5 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date3 Oct 2015UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.1876, 0.3293UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Hadlow Place solar farm
  2. Permit granted: Hadlow Place solar farm (planning authority Tunbridge Wells, reference 14/00870/FULL)
  3. Permit applied for: Hadlow Place solar farm (planning authority Tunbridge Wells, reference 14/00870/FULL)

How it compares

Hadlow Solar Park Lilley Farm grid connection is the 1,528th-largest of 3,539 grid connections in England and the 2,179th-largest of 4,870 in the United Kingdom by capacity; its 16.5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,528th of 3,539341,715 MW<0.1%
United Kingdom2,179th of 4,870467,981 MW<0.1%
All grid connections in our data5,726th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 375 substations, 326 power plants (131 operating, 6,758 MW) and 55 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hadlow Place solar farmPower plant14.3 MWOperating1.0 km
Capel 11kVSubstation——2.3 km
Pembury Grid 33kVSubstation——2.4 km
Capel Grange Solar ParkPower plant6.6 MWOperating2.6 km
Capel GrangePower plant10.4 MWCancelled2.6 km
Tonbridge East 6.6kVSubstation——3.2 km
CXD Infrastructure SolutionsData center——18 km
CustodianDC MaidstoneData center——18 km
Goldman Sachs data center, East GrinsteadData center——27 km

Holder, grid operator and place

More from British Solar Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom