Grid connection · England, United Kingdom

Great Field Lane grid connection

Great Field Lane grid connection is a planned grid connection in England, United Kingdom, with 60 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Great Field Lane BESS Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Accepted To Connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSaltend North (via: gsp)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity60 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date27 Feb 2025Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7535, -0.2690Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Great Field Lane grid connection is the 488th-largest of 2,533 grid connections in England and the 672nd-largest of 3,903 in the United Kingdom by capacity; its 60 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England488th of 2,533319,370 MW<0.1%
United Kingdom672nd of 3,903446,745 MW<0.1%
All grid connections in our data3,551st of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 285 power plants (71 operating, 3,598 MW), 115 substations, 1 transmission line and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
King George DockSubstation——0.9 km
Hull East 33/11kVSubstation——1.1 km
Hull East 132/33kVSubstation——1.1 km
Hull East Stor Generation Compound - Battery energy storagePower plant20 MWPermitted1.3 km
King George DockPower plant9 MWOperating1.3 km
Green Frog Power, Great Field Lane - Battery Energy Storage SystemPower plant20 MWPermitted1.5 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled11 km
Aldbrough Hydrogen StorageCO2 emitter—Planned14 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom