Grid connection · England, United Kingdom

Goyt Hall Farm grid connection

Goyt Hall Farm grid connection is a planned grid connection in England, United Kingdom, with 40 MW of capacity, held by Queequeg Renewables Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceGOYT HALL FARM grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Bredbury GSP)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderQueequeg Renewables LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toGoyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage (matched by shared name+coordinates+technology+capacity+company, 0.43 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toBredbury GSP (via a grid supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity40 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date6 Feb 2022SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.4117, -2.1100SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage (planning authority Stockport, reference DC/090340)
  2. Permit applied for: Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage (planning authority Stockport, reference DC/090340)

How it compares

Goyt Hall Farm grid connection is the 740th-largest of 2,533 grid connections in England and the 1,138th-largest of 3,903 in the United Kingdom by capacity; its 40 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England740th of 2,533319,370 MW<0.1%
United Kingdom1,138th of 3,903446,745 MW<0.1%
All grid connections in our data4,573rd of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 460 substations, 380 power plants (106 operating, 1,095 MW), 22 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy StoragePower plant40 MWPermitted0.4 km
RomileySubstation——1.1 km
Bredbury GSPSubstation——1.3 km
Bredbury Substation - Battery Storage FacilityPower plant49.9 MWUnder construction1.4 km
Vernon Park BSPSubstation——1.5 km
Welkin Road, Bredbury - Battery Storage SystemPower plant20 MWOperating1.6 km
CDL Strata Campus Data CentreData center——4.6 km
Data center, England (OSM way 703959498)Data center——7.7 km
Equinix MA4Data center——10 km

Holder, grid operator and place

More from Queequeg Renewables Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page