Gas and Solar 5.214 MW grid connection at Four Lane Ends

Gas and Solar 5.214 MW grid connection at Four Lane Ends is a grid connection in England, United Kingdom, with 5.21 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Four Lane Ends)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toFour Lane Ends (via a primary substation)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity5.21 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyGasNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.8074, -1.7932Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Gas and Solar 5.214 MW grid connection at Four Lane Ends is the 1,654th-largest of 2,533 grid connections in England and the 2,566th-largest of 3,903 in the United Kingdom by capacity; its 5.21 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,654th of 2,533319,370 MW<0.1%
United Kingdom2,566th of 3,903446,745 MW<0.1%
All grid connections in our data6,221st of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 320 power plants (91 operating, 1,054 MW), 265 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Toller LaneSubstation——0.4 km
Four Lane EndsSubstation——0.8 km
Stor Generation Plant - Battery StoragePower plant12 MWPermitted1.3 km
GirlingtonSubstation——1.3 km
Midland Road - Battery Energy StoragePower plant80 MWPermitted2.6 km
Bradford Energy Recovery FacilityPower plant12.9 MWCancelled4.1 km
Yorkshire GREENTransmission line—Permitted36 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc