Grid connection · England, United Kingdom

Gas 5.35 MW grid connection at Ellifoot Lane

Gas 5.35 MW grid connection at Ellifoot Lane is a planned grid connection in England, United Kingdom, with 5.35 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Ellifoot Lane)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Accepted To Connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toEllifoot Lane (via: primary)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity5.35 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyGasNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date18 Oct 2024Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7363, -0.1372Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Gas 5.35 MW grid connection at Ellifoot Lane is the 1,645th-largest of 2,533 grid connections in England and the 2,552nd-largest of 3,903 in the United Kingdom by capacity; its 5.35 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,645th of 2,533319,370 MW<0.1%
United Kingdom2,552nd of 3,903446,745 MW<0.1%
All grid connections in our data6,205th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 247 power plants (60 operating, 876 MW), 103 substations, 1 CO2 emitter and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Ellifoot LaneSubstation——0.3 km
Elstronwick, Burstwick - Daisy Hill Solar Photovoltaic FarmPower plant35 MWPermitted1.8 km
Burton Pidsea (Wadworth Hill) Wind FarmPower plant10.2 MWOperating2.3 km
Bowmar Carr Road, Burton Pidsea - Solar ArrayPower plant1 MWPermitted3.6 km
Ottringham RoadSubstation——3.8 km
Burton PidseaSubstation——5.0 km
Aldbrough Hydrogen StorageCO2 emitter—Planned8.8 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled20 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom