Grid connection · England, United Kingdom

FDG Chatteris Way grid connection

FDG Chatteris Way grid connection is a grid connection in England, United Kingdom, with 4.7 MW of capacity, held by Pretoria Energy Company.

Map: where FDG Chatteris Way grid connection lies
52.4205, 0.0970 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at March Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderPretoria Energy CompanyUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity4.7 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyGasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.4205, 0.0970UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

FDG Chatteris Way grid connection is the 2,431st-largest of 3,539 grid connections in England and the 3,359th-largest of 4,870 in the United Kingdom by capacity; its 4.7 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,431st of 3,539341,715 MW<0.1%
United Kingdom3,359th of 4,870467,981 MW<0.1%
All grid connections in our data7,065th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 361 power plants (147 operating, 5,164 MW), 105 substations, 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Mepal CHPPower plant14.4 MWOperating1.0 km
Elean Business Park Biomass PlantPower plant40 MWOperating3.5 km
EPR Ely LtdPower plant38 MWOperating3.5 km
Chatteris Primary 11kVSubstation——5.5 km
Aldreth Primary 11kVSubstation——9.1 km
Ely Primary 11kVSubstation——11 km
Positive ParkData center——18 km
Redcentric CambridgeData center——21 km
West Cambridge Data CentreData center——24 km

Holder, grid operator and place

More from Pretoria Energy Company

Other grid connections in England

All 4837 grid connections in England, United Kingdom