Grid connection · England, United Kingdom

Fdg B-01 Coltishall Solar Park grid connection

Fdg B-01 Coltishall Solar Park grid connection is a grid connection in England, United Kingdom, with 40 MW of capacity, held by ESM Power Limited.

Map: where Fdg B-01 Coltishall Solar Park grid connection lies
52.7577, 1.3489 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Scottow Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderESM Power LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toScottow Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toScottow Moor - RAF Coltishall Solar Farm (Phase 1) (matched by shared name+coordinates+technology+capacity, 0.82 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity40 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date28 Mar 2015UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.7577, 1.3489UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Scottow Moor - RAF Coltishall Solar Farm (Phase 1)
  2. Permit granted: Scottow Moor - RAF Coltishall Solar Farm (Phase 1) (planning authority North Norfolk, reference PF/14/1334)
  3. Permit applied for: Scottow Moor - RAF Coltishall Solar Farm (Phase 1) (planning authority North Norfolk, reference PF/14/1334)

How it compares

Fdg B-01 Coltishall Solar Park grid connection is the 910th-largest of 3,539 grid connections in England and the 1,297th-largest of 4,870 in the United Kingdom by capacity; its 40 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England910th of 3,539341,715 MW<0.1%
United Kingdom1,297th of 4,870467,981 MW<0.1%
All grid connections in our data4,547th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 188 power plants (65 operating, 1,342 MW), 75 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Scottow Solar Farm - Battery StoragePower plant4.35 MWPermitted0.3 km
Scottow Moor - RAF Coltishall Solar Farm (Phase 1)Power plant32 MWOperating0.8 km
Scottow Moor - RAF Coltishall Solar Farm (Phase 2)Power plant17.9 MWOperating0.8 km
Scottow Primary 11kVSubstation——1.4 km
Worstead Primary 11kVSubstation——3.9 km
North Walsham Primary 11kVSubstation——6.0 km
Norwich to TilburyTransmission line—Planned21 km

Holder, grid operator and place

More from ESM Power Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page