Power plant · North Norfolk, England, United Kingdom

Scottow Moor - RAF Coltishall Solar Farm (Phase 2)

Scottow Moor - RAF Coltishall Solar Farm (Phase 2) is a power plant in North Norfolk, England, United Kingdom, with 17.9 MW of capacity, operated by Greencoat Capital.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Norfolk (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFormer RAF Coltishall, Coltishall Airfield, Filby Road, Norwich, NorfolkDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2016DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date23 Dec 2014 (permit PF/14/1334, Town and Country Planning Act, issued by North Norfolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Oct 2014 (reference PF/14/1334, planning authority North Norfolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Dec 2014 (granted, reference PF/14/1334, planning authority North Norfolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreencoat CapitalDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity17.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.7556, 1.3606DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Scottow Moor - RAF Coltishall Solar Farm (Phase 2) is the 708th-largest of 3,430 power plants in England and the 1,289th-largest of 5,050 in the United Kingdom by capacity; its 17.9 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England708th of 3,43071,985 MW<0.1%
United Kingdom1,289th of 5,050115,642 MW<0.1%
All power plants in our data4,452nd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. PF/14/1334
  2. Started operating

Nearby

Within 50 km of this power plant: 1 transmission line, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Norwich to TilburyTransmission line—Planned21 km

Operator and place

More from Greencoat Capital

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page