FDG A-19 Chatteris Road 1 / Chatteris Road 2 grid connection

FDG A-19 Chatteris Road 1 / Chatteris Road 2 grid connection is a grid connection in England, United Kingdom, with 1 MW of capacity, held by Hallmark Power Limited.

Map: where FDG A-19 Chatteris Road 1 / Chatteris Road 2 grid connection lies
52.4248, 0.0237 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Chatteris Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderHallmark Power LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toChatteris Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity1 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyWindUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date9 Nov 2015UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.4248, 0.0237UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

FDG A-19 Chatteris Road 1 / Chatteris Road 2 grid connection is the 3,467th-largest of 3,539 grid connections in England and the 4,779th-largest of 4,870 in the United Kingdom by capacity; its 1 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England3,467th of 3,539341,715 MW<0.1%
United Kingdom4,779th of 4,870467,981 MW<0.1%
All grid connections in our data8,521st of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 387 power plants (155 operating, 5,258 MW), 106 substations, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Alan Bartlett & Sons SolarPower plant1.2 MWOperating3.2 km
Chatteris Wind FarmPower plant126 MWPlanned3.4 km
Red TilePower plant24 MWOperating3.4 km
Chatteris Primary 11kVSubstation——3.6 km
Bury Grid 11kVSubstation——11 km
Bury Primary 11kVSubstation——11 km
Positive ParkData center——18 km
Redcentric CambridgeData center——23 km
Data center, England (OSM way 87850427)Data center——24 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom