RARE CONTEXT Request research

Grid connection · England, United Kingdom

Crabbs Green Farm grid connection

Crabbs Green Farm grid connection is a planned grid connection in England, United Kingdom, with 60 MW of capacity, held by Snakes Meadow Energy Centre Limited.

Map: where Crabbs Green Farm grid connection lies
51.9375, 0.1147 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Pelham)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderSnakes Meadow Energy Centre LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity60 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date17 Jun 2020UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date12 Jan 2024 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.9375, 0.1147UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Crabbs Green Farm grid connection is the 546th-largest of 3,539 grid connections in England and the 726th-largest of 4,870 in the United Kingdom by capacity; its 60 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England546th of 3,539341,715 MW<0.1%
United Kingdom726th of 4,870467,981 MW<0.1%
All grid connections in our data3,728th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 412 power plants (159 operating, 4,155 MW), 343 substations, 53 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ginns Road, Stocking Pelham - Battery Energy StoragePower plant400 MWPermitted0.4 km
Stocking Pelham - Battery Storage SystemPower plant50 MWCancelled0.5 km
Greens Farm - Battery energy storagePower plant50 MWPermitted0.5 km
Bishops Stortford Grid 33kVSubstation——6.9 km
Hanger Lea Primary 11kVSubstation——7.2 km
Newtown Primary 11kVSubstation——8.3 km
Kao Data KLON-02Data center——19 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating19 km
Kao Data KLON-01Data center——19 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page