Grid connection · England, United Kingdom

CEL Bridgewater BESS grid connection

CEL Bridgewater BESS grid connection is a planned grid connection in England, United Kingdom, with 90 MW of capacity, held by Cragside Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCEL BRIDGEWATER BESS grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at South Manchester GSP)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderCragside Energy LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toGolf Road - Battery Energy Storage (matched by coordinates+technology+capacity+company, 0.43 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity90 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date5 Sept 2022SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.4214, -2.2838SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

CEL Bridgewater BESS grid connection is the 388th-largest of 2,533 grid connections in England and the 510th-largest of 3,903 in the United Kingdom by capacity; its 90 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England388th of 2,533319,370 MW<0.1%
United Kingdom510th of 3,903446,745 MW<0.1%
All grid connections in our data3,155th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 384 power plants (108 operating, 1,230 MW), 45 substations, 21 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Freshfields, Fairy Lane - Battery StoragePower plant99.9 MWUnder construction0.3 km
Golf Road - Battery Energy StoragePower plant90 MWPermitted0.4 km
Sale Golf Club, Golf Road - Battery StoragePower plant70 MWPermitted0.4 km
Delta HouseData center——5.0 km
Datum Datacentres (MCR2)Data center——5.0 km
Joule HouseData center——5.2 km
Keuper Underground Gas Storage Facility Material Change 1Gas storage facility—Planned24 km
Keuper Gas Storage ProjectGas storage facility—Permitted24 km
Salinae Hydrogen Storage projectGas storage facility—Planned33 km

Holder, grid operator and place

More from Cragside Energy Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom