RARE CONTEXT Request research

Grid connection · England, United Kingdom

Cantelupe Farm grid connection

Cantelupe Farm grid connection is a grid connection in England, United Kingdom, with 5 MW of capacity, held by Harlaxton Engineering Services Limited.

Map: where Cantelupe Farm grid connection lies
52.1665, 0.0649 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Little Barford 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderHarlaxton Engineering Services LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toCantelupe Solar Farm (matched by name+coordinates+technology+capacity, 0.78 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity5 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date17 Sept 2013UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.1665, 0.0649UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Cantelupe Solar Farm
  2. Permit granted: Cantelupe Solar Farm (planning authority South Cambridgeshire, reference S/0154/11)
  3. Permit applied for: Cantelupe Solar Farm (planning authority South Cambridgeshire, reference S/0154/11)

How it compares

Cantelupe Farm grid connection is the 2,306th-largest of 3,539 grid connections in England and the 3,191st-largest of 4,870 in the United Kingdom by capacity; its 5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,306th of 3,539341,715 MW<0.1%
United Kingdom3,191st of 4,870467,981 MW<0.1%
All grid connections in our data6,884th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 365 power plants (151 operating, 3,331 MW), 164 substations, 11 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Cantelupe Solar FarmPower plant5 MWOperating0.8 km
Barton Road, Barton - Solar FarmPower plant5 MWCancelled1.4 km
West Cambridge Data CentreData center——4.8 km
St Anthony St Primary 11kVSubstation——5.2 km
Madingley Rd Primary 11kVSubstation——5.4 km
Radnor Primary 11kVSubstation——5.8 km
St Bedes Inter-Church SchoolPower plant1 MWPermitted7.4 km
Redcentric CambridgeData center——9.2 km
Starwood HouseData center——28 km

Holder, grid operator and place

More from Harlaxton Engineering Services Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom