Bybrook Sewage Works Phs 2 grid connection is a grid connection in England, United Kingdom, with 1.15 MW of capacity, held by Southern Water Services Limited.

Map: where Bybrook Sewage Works Phs 2 grid connection lies
51.1584, 0.8813 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Ashford East 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderSouthern Water Services LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toAshford East 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity1.15 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySewage gasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date1 Jan 2010UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.1584, 0.8813UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Bybrook Sewage Works Phs 2 grid connection is the 3,400th-largest of 3,539 grid connections in England and the 4,692nd-largest of 4,870 in the United Kingdom by capacity; its 1.15 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England3,400th of 3,539341,715 MW<0.1%
United Kingdom4,692nd of 4,870467,981 MW<0.1%
All grid connections in our data8,434th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 212 power plants (81 operating, 6,149 MW), 141 substations, 5 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ashford East 11kVSubstation——1.2 km
Premier Grocery Products, Kennington Road - Solar PanelsPower plant2.15 MWPermitted1.5 km
Ashford Central 6.6kVSubstation——1.7 km
Singleton 6.6kVSubstation——2.7 km
Oaklands FarmPower plant6.9 MWOperating5.0 km
Westwell Leacon Renewable Energy Facility (Waste AD)Power plant2 MWCancelled7.3 km
Sota DatacentreData center——20 km
CustodianDC MaidstoneData center——27 km
CXD Infrastructure SolutionsData center——27 km