Power plant · Ashford, England, United Kingdom

Westwell Leacon Renewable Energy Facility (Waste AD)

Westwell Leacon Renewable Energy Facility (Waste AD) is a cancelled power plant in Ashford, England, United Kingdom, with 2 MW of capacity, operated by Future Biogas.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAshford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address1km west of Westwell Leacon & 1.5km south of CharingDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Oct 2010 (reference 10/01491/AS, planning authority Ashford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Oct 2012 (appeal refused, reference 10/01491/AS, planning authority Ashford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Oct 2011 (refused, reference 10/01491/AS, planning authority Ashford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFuture BiogasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1933, 0.7926DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Ashford, reference 10/01491/AS)
  2. Permit refused (planning authority Ashford, reference 10/01491/AS)
  3. Permit applied for (planning authority Ashford, reference 10/01491/AS)

How it compares

Westwell Leacon Renewable Energy Facility (Waste AD) is the 2,789th-largest of 3,430 power plants in England and the 4,162nd-largest of 5,050 in the United Kingdom by capacity; its 2 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,789th of 3,43071,965 MW<0.1%
United Kingdom4,162nd of 5,050115,622 MW<0.1%
All power plants in our data10,440th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Sota DatacentreData center——14 km
CustodianDC MaidstoneData center——19 km
CXD Infrastructure SolutionsData center——20 km
Richborough Connection ProjectTransmission line—Permitted34 km

Operator and place

More from Future Biogas

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page