Grid connection · England, United Kingdom

Bradenstoke Solar Park (Lyneham) PV grid connection

Bradenstoke Solar Park (Lyneham) PV grid connection is a grid connection in England, United Kingdom, with 47.4 MW of capacity, held by Renewable Energy Connections Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBRADENSTOKE SOLAR PARK (LYNEHAM) PV grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Lydiard Plain PV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderRenewable Energy Connections LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toMinety GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBradenstoke solar park (matched by name+coordinates+technology, 1.13 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity47.4 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date20 Sept 2016SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.5076, -1.9815SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Bradenstoke solar park
  2. Permit granted: Bradenstoke solar park (planning authority Wiltshire, reference 14/06989/FUL)
  3. Permit applied for: Bradenstoke solar park (planning authority Wiltshire, reference 14/06989/FUL)

How it compares

Bradenstoke Solar Park (Lyneham) PV grid connection is the 689th-largest of 2,533 grid connections in England and the 1,053rd-largest of 3,903 in the United Kingdom by capacity; its 47.4 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England689th of 2,533319,370 MW<0.1%
United Kingdom1,053rd of 3,903446,745 MW<0.1%
All grid connections in our data4,443rd of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 408 power plants (152 operating, 1,979 MW), 108 substations, 8 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Bradenstoke solar parkPower plant69.8 MWOperating1.1 km
Lyneham PrimarySubstation——2.7 km
Swallett Energy ParkPower plant23 MWPermitted3.0 km
High Penn Solar ParkPower plant9.6 MWOperating6.2 km
Calne PrimarySubstation——6.3 km
Wootton Bassett PrimarySubstation——6.6 km
VodafoneData center——10 km
Nationwide Swindon Technology CentreData center——12 km
AWS Swindon Data CentreData center——15 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page