Battery storage and Solar and Wind 50 MW grid connection at High Bridge Farm Hybrid Direct

Battery storage and Solar and Wind 50 MW grid connection at High Bridge Farm Hybrid Direct is a planned grid connection in England, United Kingdom, with 50 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: High Bridge Farm Hybrid Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Accepted To Connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSaltend 132/33kV (via: bsp)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity50 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWindNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date7 Aug 2024Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7136, -0.1339Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage and Solar and Wind 50 MW grid connection at High Bridge Farm Hybrid Direct is the 538th-largest of 2,533 grid connections in England and the 804th-largest of 3,903 in the United Kingdom by capacity; its 50 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England538th of 2,533319,370 MW<0.1%
United Kingdom804th of 3,903446,745 MW<0.1%
All grid connections in our data3,801st of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 252 power plants (62 operating, 881 MW), 103 substations, 1 CO2 emitter and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Ottringham Road, Keyingham - Anaerobic Digestion FacilityPower plant7 MWPermitted2.3 km
Ottringham RoadSubstation——2.3 km
Ellifoot LaneSubstation——2.8 km
Far Marsh FarmPower plant7.5 MWOperating4.2 km
Burton Pidsea (Wadworth Hill) Wind FarmPower plant10.2 MWOperating4.3 km
Patrington RoadSubstation——4.6 km
Aldbrough Hydrogen StorageCO2 emitter—Planned11 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled21 km

Grid operator and place