RARE CONTEXT Request research

Grid connection · England, United Kingdom

Barling Landfill Site grid connection

Barling Landfill Site grid connection is a grid connection in England, United Kingdom, with 2.6 MW of capacity, held by Cory Environmental.

Map: where Barling Landfill Site grid connection lies
51.5810, 0.7929 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Thorpe Bay Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderCory EnvironmentalUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toBarling Hall Farm (matched by shared name+coordinates+technology+capacity+company, 0.24 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Attached toThorpe Bay Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity2.6 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyLandfill gasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date16 Jul 2004UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.5810, 0.7929UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Barling Hall Farm
  2. Permit granted: Barling Hall Farm (planning authority Rochford)
  3. Permit applied for: Barling Hall Farm (planning authority Rochford)

How it compares

Barling Landfill Site grid connection is the 2,857th-largest of 3,539 grid connections in England and the 3,918th-largest of 4,870 in the United Kingdom by capacity; its 2.6 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,857th of 3,539341,715 MW<0.1%
United Kingdom3,918th of 4,870467,981 MW<0.1%
All grid connections in our data7,649th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 349 power plants (148 operating, 7,966 MW), 213 substations, 10 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Barling Hall FarmPower plant2.4 MWOperating0.2 km
Fleethall Grid 33kVSubstation——4.2 km
Fleethall Local Primary 11kVSubstation——4.2 km
Burnham Primary 11kVSubstation——5.4 km
Campfield Road, Shoeburyness - Solar Photovoltaic PanelsPower plant1 MWPermitted5.5 km
Bolt Hall Farm, Lark Hill Road - Solar Photovoltaic Farm.Power plant50 MWPlanned6.3 km
CityFibre CabinetsData center——10 km
Imperium 315Data center——21 km
Sota DatacentreData center——30 km

Holder, grid operator and place

More from Cory Environmental

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page