RARE CONTEXT Request research

Grid connection · England, United Kingdom

(ANM) Land South Of A47 grid connection

(ANM) Land South Of A47 grid connection is a planned grid connection in England, United Kingdom, with 49.5 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where (ANM) Land South Of A47 grid connection lies
52.6476, 1.1467 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Norwich)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity49.5 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date16 Oct 2020UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2030 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.6476, 1.1467UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

(ANM) Land South Of A47 grid connection is the 803rd-largest of 3,539 grid connections in England and the 1,139th-largest of 4,870 in the United Kingdom by capacity; its 49.5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England803rd of 3,539341,715 MW<0.1%
United Kingdom1,139th of 4,870467,981 MW<0.1%
All grid connections in our data4,333rd of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 221 power plants (78 operating, 1,183 MW), 94 substations, 1 transmission line and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Land to the west of Blind LanePower plant1.5 MWCancelled1.2 km
Costessey Landfill Gas Project 2Power plant2 MWOperating3.5 km
Barnham Broom Hotel and Golf ClubPower plant1 MWPlanned3.6 km
Earlham Grid Local 11kVSubstation——5.9 km
Earlham Grid Local B 11kVSubstation——5.9 km
Earlham Grid 33kVSubstation——7.0 km
Norwich to TilburyTransmission line—Planned12 km
US Air Force data center, BrandonData center——49 km

Grid operator and place

More from Eastern Power Networks plc

Other grid connections in England

All 4837 grid connections in England, United Kingdom