RARE CONTEXT Request research

Grid connection · England, United Kingdom

(ANM) Broadmead Road grid connection

(ANM) Broadmead Road grid connection is a planned grid connection in England, United Kingdom, with 20 MW of capacity, held by RSK Utility Consutling Limited.

Map: where (ANM) Broadmead Road grid connection lies
52.0823, -0.5127 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Marston Road Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderRSK Utility Consutling LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity20 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date18 Jan 2024UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2034 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.0823, -0.5127UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

(ANM) Broadmead Road grid connection is the 1,321st-largest of 3,539 grid connections in England and the 1,923rd-largest of 4,870 in the United Kingdom by capacity; its 20 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,321st of 3,539341,715 MW<0.1%
United Kingdom1,923rd of 4,870467,981 MW<0.1%
All grid connections in our data5,304th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 463 power plants (161 operating, 2,307 MW), 161 substations and 18 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
L'Field Stewartby Landfill SitePower plant10.7 MWOperating0.5 km
Rookery SouthPower plant65 MWOperating1.0 km
Green Lane, Stewartby - Solar PV ArrayPower plant30 MWPlanned1.3 km
Marston Rd Grid 33kVSubstation——1.4 km
Marston Rd Primary 11kVSubstation——1.5 km
West Bedford Primary 11kVSubstation——2.8 km
Pulsant Milton Keynes SE-1Data center——17 km
Data center, England (OSM way 460010263)Data center——17 km
Data center, Dunstable (OSM way 526426719)Data center——21 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page