Grid connection · England, United Kingdom
(ANM) Bracon Ash grid connection
(ANM) Bracon Ash grid connection is a planned grid connection in England, United Kingdom, with 25 MW of capacity, held by Richard Long Group Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Trowse Grid 33kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Richard Long Group Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Bracon Ash Solar (matched by name+coordinates+technology+capacity, 1.49 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 25 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 5 Jul 2020 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 31 Oct 2030 (target energisation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.5492, 1.2209 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Construction started: Bracon Ash Solar
- Permit granted: Bracon Ash Solar (planning authority South Norfolk, reference 2021/0569)
- Permit applied for: Bracon Ash Solar (planning authority South Norfolk, reference 2021/0569)
How it compares
(ANM) Bracon Ash grid connection is the 1,188th-largest of 3,539 grid connections in England and the 1,721st-largest of 4,870 in the United Kingdom by capacity; its 25 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,188th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 1,721st of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 5,073rd of 8,618 | 1,355,288 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 237 power plants (84 operating, 2,396 MW), 102 substations, 2 transmission lines and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Flordon Road, Bracon Ash - Solar Panels & Battery Storage | Power plant | 24 MW | Permitted | 0.5 km |
| Wymondham Road, Bracon Ash - Battery Energy Storage System | Power plant | 228 MW | Planned | 1.2 km |
| Bracon Ash Solar | Power plant | 28.5 MW | Under construction | 1.5 km |
| Mulbarton Primary 11kV | Substation | — | — | 2.9 km |
| Hapton Primary 11kV | Substation | — | — | 3.2 km |
| Norwich to Tilbury | Transmission line | — | Planned | 4.4 km |
| Cringleford Primary 11kV | Substation | — | — | 6.5 km |
| LionLink Interconnector | Transmission line | — | Planned | 44 km |
| US Air Force data center, Brandon | Data center | — | — | 48 km |
Holder, grid operator and place
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.