(ANM) 68-70 Reach Road grid connection is a planned grid connection in England, United Kingdom, with 99.8 MW of capacity, held by Burwell AL Limited.

Map: where (ANM) 68-70 Reach Road grid connection lies
52.2672, 0.3238 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Burwell)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderBurwell AL LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity99.8 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date12 Nov 2020UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2028 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.2672, 0.3238UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

(ANM) 68-70 Reach Road grid connection is the 392nd-largest of 3,539 grid connections in England and the 497th-largest of 4,870 in the United Kingdom by capacity; its 99.8 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England392nd of 3,539341,715 MW<0.1%
United Kingdom497th of 4,870467,981 MW<0.1%
All grid connections in our data3,249th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 307 power plants (135 operating, 2,487 MW), 123 substations, 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Reach RoadPower plant49.9 MWPermitted0.4 km
Land Southwest of Hightown Drove, Burwell - Battery Energy Storage SystemPower plant90 MWCancelled0.8 km
Weirs Drove, Burwell - Battery Storage FacilityPower plant30 MWPlanned1.0 km
Burwell Local Grid 33kVSubstation——1.2 km
Burwell Primary 11kVSubstation——1.2 km
Exning Primary 11kVSubstation——2.3 km
Redcentric CambridgeData center——12 km
West Cambridge Data CentreData center——18 km
US Air Force data center, BrandonData center——21 km