Power plant · East Cambridgeshire, England, United Kingdom

Land Southwest of Hightown Drove, Burwell - Battery Energy Storage System

Land Southwest of Hightown Drove, Burwell - Battery Energy Storage System is a cancelled power plant in East Cambridgeshire, England, United Kingdom, with 90 MW of capacity, operated by Grenergy Renewables UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Cambridgeshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSw/O Hightown Drove, Burwell, Cambridge, CB25 0HDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Jul 2025 (reference 25/00639/FUM, planning authority East Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date9 Mar 2026 (refused, reference 25/00639/FUM, planning authority East Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGrenergy Renewables UK LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity90 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.2732, 0.3308DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Land Southwest of Hightown Drove, Burwell - Battery Energy Storage System is the 100th-largest of 3,430 power plants in England and the 172nd-largest of 5,050 in the United Kingdom by capacity; its 90 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England100th of 3,43071,985 MW0.13%
United Kingdom172nd of 5,050115,642 MW<0.1%
All power plants in our data1,290th of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Redcentric CambridgeData center——13 km
West Cambridge Data CentreData center——19 km
US Air Force data center, BrandonData center——20 km
Bramford to TwinsteadTransmission line—Permitted46 km

Operator and place

More from Grenergy Renewables UK Limited

Other power plants in England

All 5809 power plants in England, United Kingdom