Grid connection · the United Kingdom

East Anglia Three grid connection

East Anglia Three grid connection is a permitted grid connection in the United Kingdom, with 1,320 MW of capacity, held by East Anglia Three Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationUnited Kingdom (connects at East Anglia Project Three Offshore Platform)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPermitted (consents approved)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderEast Anglia Three LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toEast Anglia ThreeNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,320 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Dec 2028 (stage 2, cumulative 1,320 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Jan 2026 (stage 1, cumulative 1,200 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

East Anglia Three grid connection is the 70th-largest of 3,903 grid connections in the United Kingdom by capacity; its 1,320 MW is 0.3% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
United Kingdom70th of 3,903446,745 MW0.3%
All grid connections in our data114th of 7,6161,281,251 MW0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 connected, 1,200 MW in total
  2. Stage 2 due to connect, 1,320 MW in total

Holder, grid operator and place

More from East Anglia Three Limited

Other grid connections in United Kingdom

All 5913 grid connections in the United Kingdom

Data on this page