Data center · Collin County, Texas, United States
DataBank Plano Data Center
DataBank Plano Data Center is a data center in Collin County, Texas, United States, operated by DataBank.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Collin County, Texas | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | 8375 Dominion Parkway, Plano, TX 75024 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | DataBank | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Website | https://www.databank.com/data-centers/dallas/plano-campus/plano-data-center/ | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 61,977 m² (site outline) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 33.0870, -96.8155 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
DataBank operates 18 of the 1,336 data centers in the United States in our data with a named owner; 13 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% | |
| DataBank | 14th | 18 | 1.3% |
Nearby
Within 50 km of this data center: 6 power plants (3 operating, 3,674 MW), 1 AI supercomputer and 1 mine, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| NVIDIA CoreWeave Eos-DFW Phase 1 | AI supercomputer | 10,752 H100e | Operating | 9.3 km |
| Boxcar Energy Storage | Power plant | 150 MW | Under construction | 29 km |
| Denton Pits | Mine | — | Operating | 32 km |
| Mallard Energy Storage | Power plant | 250 MW | Under construction | 34 km |
| Lake Hubbard | Power plant | 928 MW | Operating | 38 km |
Operator and place
More from DataBank
- DataBank Las Vegas LAS1data center
- DataBank IAD3data center
- DataBank Santa Clara SFO1data center
- Databank LGA3data center
- DataBank SLC6data center
- DataBank IAD2data center
- DataBank - DEN5data center
- DataBank - DEN2data center
Other data centers in Texas
- OpenAI Stargate Abilene421 MW
- CoreWeave Denton TX262 MW
- Meta Temple178 MW
- Coreweave Helios132 MW
- Google Midlothian103 MW
- Google Red Oak77 MW
- Microsoft SAT4075 MW
- Microsoft SAT1447 MW
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- MSHA Mines Data Set. MSHA Mines Data Set, Public domain.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.
- Virginia DEQ issued data center air permits. Virginia DEQ issued data center air permits, Public records.