Data center · Texas, United States
Microsoft SAT14
Microsoft SAT14 is a data center in Texas, United States, with 47 MW of IT power, owned by Microsoft Corporation.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Texas | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Address | 3545 Wiseman Boulevard, San Antonio, TX 78251 | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Start year | 2024 | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Owner | Microsoft Corporation | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| IT power | 47 MW | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Compute (H100 equivalents) | 45,174 H100e | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Capital cost | $1.78 bn | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Chips | H100, B300 | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 29.4732, -98.6815 | US Census Bureau Geocoder · Public domain · checked 24 Oct 2026 |
Know more about this data center, or want an introduction to its owner? Ask us.
How it compares
Microsoft SAT14 is the 8th-largest of 9 data centers in Texas and the 56th-largest of 60 in the United States by IT power; its 47 MW is 0.39% of the 11,978 MW we hold for the United States. Ranks and totals cover the data centers in our data that report their IT power, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Texas | 8th of 9 | 1,327 MW | 3.5% |
| United States | 56th of 60 | 11,978 MW | 0.39% |
| All data centers in our data | 66th of 74 | 14,203 MW | 0.33% |
Nearby
Within 50 km of this data center: 12 power plants (4 operating, 4,094 MW), measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Ferdinand Energy Center | Power plant | 200 MW | Under construction | 17 km |
| El Patrimonio | Power plant | 150 MW | Planned | 31 km |
| Bexar ESS | Power plant | 100 MW | Under construction | 31 km |
Owner and place
More from Microsoft Corporation
Other data centers in Texas
- OpenAI Stargate Abilene421 MW
- CoreWeave Denton TX262 MW
- Meta Temple178 MW
- Coreweave Helios132 MW
- Google Midlothian103 MW
- Google Red Oak77 MW
- Microsoft SAT4075 MW
- Vantage TX132 MW
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- US Census Bureau Geocoder. US Census Bureau Geocoder, Public domain.