Data center · Texas, United States
Coreweave Helios
Coreweave Helios is a data center in Texas, United States, with 132 MW of IT power, owned by CoreWeave.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Texas | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Address | 984 County Road 112, Afton, TX 79220 | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Start year | 2026 | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Owner | CoreWeave | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Used by | OpenAI | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| IT power | 132 MW | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Compute (H100 equivalents) | 159,552 H100e | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Capital cost | $5 bn | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Chips | B200 | Epoch AI data centers · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 33.7806, -100.8671 | US Census Bureau Geocoder · Public domain · checked 24 Oct 2026 |
Know more about this data center, or want an introduction to its owner? Ask us.
How it compares
Coreweave Helios is the 4th-largest of 9 data centers in Texas and the 38th-largest of 60 in the United States by IT power; its 132 MW is 1.1% of the 11,978 MW we hold for the United States. Ranks and totals cover the data centers in our data that report their IT power, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Texas | 4th of 9 | 1,327 MW | 9.9% |
| United States | 38th of 60 | 11,978 MW | 1.1% |
| All data centers in our data | 45th of 75 | 14,257 MW | 0.93% |
Nearby
Within 50 km of this data center: 3 power plants, measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Donegal Solar Project | Power plant | 204 MW | Permitted | 1.8 km |
| Cone Renewable Energy Project, LLC | Power plant | 300 MW | Permitted | 44 km |
| Clairemont Solar | Power plant | 500 MW | Planned | 47 km |
Owner, user and place
More from CoreWeave
- CoreWeave Denton TX262 MW
- CoreWeave Chester VA82 MW
- CoreWeave Ellendale ND68 MW
- CoreWeave Marble NC65 MW
- CoreWeave Norway42 MW
- CoreWeave Dalton 1 & 228 MW
- CoreWeave Lancaster Greenfield sitedata center · under construction
- CoreWeave Muskogee OKdata center · under construction
Other data centers in Texas
- OpenAI Stargate Abilene421 MW
- CoreWeave Denton TX262 MW
- Meta Temple178 MW
- Google Midlothian103 MW
- Google Red Oak77 MW
- Microsoft SAT4075 MW
- Microsoft SAT1447 MW
- Vantage TX132 MW
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- US Census Bureau Geocoder. US Census Bureau Geocoder, Public domain.