Grid connection · Nolan County, Texas, United States

Trailblazer Natural Gas Generation Plant grid connection (ERCOT 27INR0575)

Trailblazer Natural Gas Generation Plant grid connection (ERCOT 27INR0575) is a planned grid connection in Nolan County, Texas, United States, with 1,026 MW of capacity, held by Trailblazer Infrastructure LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNolan County (connects at 11420 Sweetwater East Switch 345 kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, no interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderTrailblazer Infrastructure LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity1,026 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyNatural gasERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date11 May 2026ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date12 Dec 2027 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Trailblazer Natural Gas Generation Plant grid connection (ERCOT 27INR0575) is the 47th-largest of 1,710 grid connections in Texas and the 101st-largest of 4,021 in the United States by capacity; its 1,026 MW is 0.11% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas47th of 1,710438,874 MW0.23%
United States101st of 4,021923,876 MW0.11%
All grid connections in our data198th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from Trailblazer Infrastructure LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page