Substation · England, United Kingdom
Whitely Primary
Whitely Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Demand headroom | 0.37 MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Generation headroom | 0 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Transformers | 2 x 15 / 30MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Level | Primary | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Botley Wood BSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Planned reinforcement | Replace both transformers with 20 / 40MVA units (due Sep 2027) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (offtake) | Full (red on the heat map, limited by substation thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Full (red on the heat map, limited by upstream thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.8762, -1.2490 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 256 power plants (111 operating, 1,005 MW), 236 grid connections (133 operating, 1,179 MW), 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Concorde Way, Segensworth - Solar Panels | Power plant | 1.04 MW | Under construction | 0.6 km |
| SCC | Data center | — | — | 0.9 km |
| Astrohouse | Data center | — | — | 0.9 km |
| Serverhouse | Data center | — | — | 1.0 km |
| Batley's Power Station grid connection | Grid connection | 19 MW | Operating | 1.9 km |
| Funtley Refuse Tip | Power plant | 10 MW | Cancelled | 2.3 km |
| Funtley Refuse Tip (Landfill Gas) | Power plant | 1 MW | Cancelled | 2.3 km |
| Peak GEN Fareham grid connection | Grid connection | 19 MW | Operating | 2.3 km |
| Battery storage 49.9 MW grid connection at Botley Wood | Grid connection | 49.9 MW | Operating | 2.5 km |
Grid operator and place
More from Southern Electric Power Distribution plc
- Amersham GSPsubstation
- Loudwater BSPsubstation
- Bowerdean Primarysubstation
- Flackwell Heath Primarysubstation
- Well End Primarysubstation
- Wycombe Marsh Primarysubstation
- Axminster GSPsubstation
- Yeovil BSPsubstation
Other substations in England
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.