Upper Basinghall Street is a substation in England, United Kingdom, connected by Northern Powergrid (Yorkshire) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Yorkshire) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Demand headroom | 9.16 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Generation headroom | 4.17 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Firm capacity | 24 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Level | Primary | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Fed from | Kirkstall C 2/5 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Fed from | Kirkstall B | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (offtake) | None (green on the heat map) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | None (green on the heat map) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 53.7991, -1.5460 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 441 grid connections (223 operating, 2,212 MW), 391 power plants (108 operating, 4,090 MW), 11 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Oil 1.125 MW grid connection at Upper Basinghall Street | Grid connection | 1.13 MW | Planned | 0.2 km |
| Merrion House LLP grid connection | Grid connection | 2 MW | Operating | 0.5 km |
| Generation 1 MW grid connection at Brookfield Street | Grid connection | 1 MW | Operating | 0.9 km |
| Buslingthorpe Power Station (Leeds North) | Power plant | 2 MW | Operating | 1.8 km |
| Buslingthorpe Green - Battery Energy Storage | Power plant | 49.9 MW | Permitted | 1.9 km |
| Pollington Energy Park | Power plant | 53 MW | Cancelled | 2.5 km |
| GridJet | Data center | — | — | 2.5 km |
| nLighten Leeds | Data center | — | — | 15 km |
| HSBC Wakefield Data Centre | Data center | — | — | 15 km |
Grid operator and place
Grid connections attached to this substation
More from Northern Powergrid (Yorkshire) plc
- Attercliffesubstation
- Barugh 132/66kVsubstation
- Beeston Royds 132/33kVsubstation
- Beverley 132/33kVsubstation
- Bingley 132/33kVsubstation
- Blackburn Meadows Bsubstation
- Blytonsubstation
- Bradfordsubstation
Other substations in England
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.