Power plant · North Tyneside, England, United Kingdom

Standby Embedded Stor Power Plant - Battery storage

Standby Embedded Stor Power Plant - Battery storage is a power plant under construction in North Tyneside, England, United Kingdom, with 20 MW of capacity, operated by Green Frog Power 214 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Tyneside (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressStandby Embedded Stor Power Plant, High Flatworth, Tyne Tunnel Trading Estate, North Shields, NE29 7UZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Jun 2021 (permit 21/01109/FUL, Town and Country Planning Act, issued by North Tyneside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Apr 2021 (ref. 21/01109/FUL, North Tyneside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Jun 2021 (granted, ref. 21/01109/FUL, North Tyneside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreen Frog Power 214 LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.0048, -1.4790DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Standby Embedded Stor Power Plant - Battery storage is the 1,200th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,875th-largest of 3,222 in the United Kingdom by capacity; its 20 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,200th of 2,174186,088 MW<0.1%
United Kingdom1,875th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,872nd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 251 grid connections (128 operating, 1,686 MW) and 142 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 49.9 MW grid connection at Flatworth BESSGrid connection49.9 MWPlanned0.3 km
Battery storage 17.5 MW grid connection at High Flatworth BESSGrid connection17.5 MWOperating0.3 km
Flatworth CentralSubstation——0.4 km
FlatworthSubstation——0.4 km
Battery storage 37.5 MW grid connection at Venus Park BESSGrid connection37.5 MWPlanned0.5 km
Billy MillSubstation——1.2 km

Operator and place

Grid connections attached to this power plant

More from Green Frog Power 214 Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page