Substation · England, United Kingdom

Trash Green Primary Substation

Trash Green Primary Substation is a 33 kV primary substation in England, United Kingdom, with 1.85 MVA of demand headroom and 0 MW of generation headroom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom1.85 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 7.5 / 15MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimary substationSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromBurghfield (Reserve) BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromFleet-Bramley GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.4139, -1.0487SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Nearby

Within 50 km of this substation: 289 power plants (106 operating, 3,125 MW), 212 grid connections (107 operating, 1,141 MW) and 83 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Sulhamstead Solar Field - Stud FarmPower plant5 MWCancelled1.0 km
Motorway Service Area, Burghfield - Solar FarmPower plant5 MWPermitted1.8 km
Solar 20.948 MW grid connection at Burghfield ReserveGrid connection20.9 MWPlanned2.3 km
Solar 55.3 MW grid connection at Burghfield ReserveGrid connection55.3 MWPlanned2.3 km
Pierces FarmPower plant1.7 MWOperating2.5 km
Burghfield grid connectionGrid connection1.6 MWOperating2.9 km
Pulsant Reading SL3Data center——5.1 km
Redcentric ReadingData center——5.2 km
Asanti - ReadingData center——5.5 km

Grid operator and place

Grid connections attached to this substation

More from Southern Electric Power Distribution plc

Candidate sites around this substation

12 sites of land near Trash Green Primary have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in England

All 1666 substations in England, United Kingdom

Data on this page