Swanage Primary is a 33 kV primary substation in England, United Kingdom, with 0 MVA of demand headroom and 0 MW of generation headroom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom0 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 10MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimary substationSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromMannington BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromWareham BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementReplace both transformers with 20 / 40MVA units (due Dec 2027)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.6134, -1.9730SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 152 power plants (74 operating, 574 MW), 114 grid connections (72 operating, 529 MW) and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Holes Bay Battery Storage grid connectionGrid connection7.13 MWOperating13 km
Holes BayPower plant15 MWOperating13 km
Data Vault - Bournemouth BCP01Data center——14 km
Post Farm, Lytchett Minster - Battery Energy StoragePower plant32 MWPermitted15 km
Bottom Plain PV Generation grid connectionGrid connection8.55 MWOperating15 km
Land on the West Side of Blandford Road - Battery grid connectionGrid connection25 MWOperating15 km
Oaklands PlantationPower plant5 MWOperating16 km

Grid operator and place

More from Southern Electric Power Distribution plc