Grid connection · England, United Kingdom
Land on the West Side of Blandford Road - Battery grid connection
Land on the West Side of Blandford Road - Battery grid connection is a grid connection in England, United Kingdom, with 25 MW of capacity, held by Noriker Power.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | LAND ON THE WEST SIDE OF BLANDFORD ROAD - BATTERY grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Lytchett) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Noriker Power | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Lytchett BSP (via a bulk supply point) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 25 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Battery storage | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 31 Jan 2024 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.7462, -2.0371 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Land on the West Side of Blandford Road - Battery grid connection is the 928th-largest of 2,533 grid connections in England and the 1,482nd-largest of 3,903 in the United Kingdom by capacity; its 25 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 928th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 1,482nd of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,039th of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 199 power plants (98 operating, 806 MW), 119 substations and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Lytchett BSP | Substation | — | — | 0.3 km |
| Post Farm, Lytchett Minster - Battery Energy Storage | Power plant | 32 MW | Permitted | 0.6 km |
| Beacon Hill | Power plant | 3 MW | Operating | 1.2 km |
| Race farm | Power plant | 6.1 MW | Operating | 1.5 km |
| Corfe Mullen Primary | Substation | — | — | 2.3 km |
| Creekmoor Primary | Substation | — | — | 3.1 km |
| Data Vault - Bournemouth BCP01 | Data center | — | — | 12 km |
| Sky Chilworth | Data center | — | — | 49 km |
Holder, grid operator and place
More from Noriker Power
- Rothienorman Battery Storage grid connection50 MW
- Camsiscan Farm, Craigie - Battery Energy Storage System350 MW · permitted
- Gibson Farm, Blackhillock - Battery Energy Storage System349 MW · permitted
- Welkin Mill49.9 MW
- Welkin Mill, Welkin Road - Battery Storage49.9 MW · under construction
- Noriker Power Staunch20 MW
- Perserverance Road20 MW · permitted
- Littlebrook Battery Storage7.5 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.